Proven across the manufacturing stack.
Each case below is anchored to an anonymized customer shape, a defined before-state, the workflow Polymr automated, and a measured outcome. Customer logos and reference calls available under NDA. Filter by industry to see what shipped where.

Cases shipped, by industry.
Each row carries an industry accent stripe, the headline metric, the source stack, and the before/workflow split. Click through for the full engagement detail.
All industries shipped.
Every case below carries a defined before-state, the workflow Polymr automated, a measured outcome, and a source stack. Filter the row by industry on the chips above; the panel below swaps to the industry-specific case shape.
- Furniture4 dayscycle-time eliminated from CAD drop to vendor RFQCustom commercial furniture maker, three plants
SolidWorks · Custom ERP · Outlook
CAD revisions converted to vendor RFQs in minutes.
BeforeEngineering pushed new designs on Friday afternoons. The buyer team retyped the cut list on Monday and sent RFQs out by Tuesday. Vendor responses straggled in across the week.
WorkflowNew CAD revision dropped, cut list extracted automatically, hardware classified make vs buy, preferred mills and hardware vendors matched, per-vendor RFQ packets generated and queued for buyer approval.
Measured outcome from a live customer deployment.
Read case → - Adhesives78%reduction in supplier-delay impact on weekly batch planIndustrial adhesives manufacturer, single large plant
SAP S/4HANA · Vendor portals · Email
Batch planning that survives a supplier delay.
BeforeSingle-source resin suppliers slipped two to three times a quarter. Each slip triggered a manual cascade across batch plans, customer commitments, and AP.
WorkflowSupplier delay signals from inbox and vendor portal tied to affected batches in real time. Alternate vendor and substitute resin recommendation surfaced with a price-per-kg and lead-time delta for buyer approval. Batch plan rewritten before the line stops.
Result from a configured pilot on customer data.
Read case → - Plastics2.1xplanning efficiency, freeing two planner-days per weekInjection-moulding plastics manufacturer, two plants
NetSuite · Shop-floor scanners · Excel
MRP runs against real inventory, not yesterday's.
BeforePlanners spent 9 to 12 hours per week reconciling inventory cycle counts, open POs, and in-process work before they could trust MRP output.
WorkflowContinuous reconciliation of inventory, open purchasing, and shop-floor production progress into a single planning context. Net requirements refreshed live. Exceptions surfaced for one-click release into NetSuite.
Measured outcome from a live customer deployment.
Read case → - Chemicals85%reduction in quote-to-PO cycle timeSpecialty chemicals producer, single facility
Oracle Fusion ERP · Outlook · Vendor portals
Quote-to-PO compressed from days to hours.
BeforeBuyers parsed inbound supplier quote PDFs and tallied them in spreadsheets before drafting POs back in Oracle. Quote-to-PO loop averaged three business days.
WorkflowInbound quotes parsed across email and portal, scored on price, lead time, MOQ, and supplier reliability against a rolling baseline. Recommended PO drafted in Oracle for buyer signature.
Measured outcome from a live customer deployment.
Read case → - Food and beverage92%same-day AP mismatch resolution rateMid-market food and beverage manufacturer, three plants
SAP Business One · Receiving scanners · Email
Receiving-to-payment match without a backlog.
BeforeAP reconciled receivers, POs, and invoices manually. Mismatches surfaced 30 to 60 days late and triggered painful supplier renegotiation.
WorkflowReceiver scans, PO data, and supplier invoices reconciled within hours of receipt. Mismatches surfaced to AP with a recommended resolution drafted per case (short-ship credit, price correction, line adjustment) for approval.
Result from a configured pilot on customer data.
Read case → - Tires and rubber100%revision-to-PO coverage, audit-grade traceabilityIndustrial tire and rubber goods maker, two plants
Epicor Kinetic · SolidWorks PDM · Email
Engineering revisions that propagate to purchasing automatically.
BeforeEvery BOM revision required a manual sweep of open POs and work orders. Two of every ten revisions missed an affected order, surfacing later as a quality or yield problem.
WorkflowNew revision diffed against the prior BOM, every affected open PO and work order identified, cancel-update-new-purchase recommendation per line, full audit trail attached to the revision.
Measured outcome from a live customer deployment.
Read case → - Garment$840Kannualized consolidation savings, top two categoriesApparel and uniform manufacturer, four plants
Microsoft Dynamics 365 · Excel · Custom vendor portal
Multi-site vendor consolidation, surfaced from real spend.
BeforeEach plant procured the same fabrics and findings from different vendors at meaningfully different prices, with no central view.
WorkflowHistorical purchase orders, supplier quotes, and delivery performance reconciled into a single vendor-scoring view per SKU. Consolidation recommendations issued to plant procurement leads with savings model.
Result from a configured pilot on customer data.
Read case → - Hospitality3 dayscycle eliminated between RFQ and a draft quote-plus-jobCommercial hospitality equipment fabricator, single plant
AutoCAD · JobBoss · Email
Custom hospitality builds quoted and BOMed in one pass.
BeforeEach custom hospitality order required estimating, engineering, and purchasing to do separate passes over the same drawing, often a full week apart.
WorkflowInbound RFQ drawing parsed, BOM generated, vendor matched, cost-up estimate drafted with margin guard, quote and job pre-routed in JobBoss for approval.
Representative scenario; illustrative of the workflow shape.
Read case → - IndustrialLivemargin and bottleneck visibility, replacing quarterly reviewMulti-site industrial components manufacturer
NetSuite · Snowflake · Shop-floor MES
Live margin and bottleneck view that replaces the quarterly review.
BeforePer-SKU margin was a quarterly finance exercise. Bottleneck signal was a Monday morning meeting. Neither was live.
WorkflowLive inventory movement, purchase prices, and shop-floor production progress combined into a continuously-refreshed per-SKU margin view and per-work-centre bottleneck signal.
Internal benchmark; pending live deployment validation.
Read case → - Furniture11 daysaverage buffer added to at-risk customer commitmentsHigh-volume furniture maker, two plants
SAP S/4HANA · Vendor portals · Outlook
Hardwood mill delays absorbed before the line stops.
BeforeHardwood mill slippage was caught only when the line was already starving. Customer commitments slipped one in five.
WorkflowInbound delay signals from mill emails and portals matched to affected jobs and downstream customer orders. Substitute species or alternate mill recommendation issued for buyer approval with a price-per-board-foot and lead-time delta.
Result from a configured pilot on customer data.
Read case →
Figures shown are illustrative of the shape of result we have measured in real and representative scenarios. Outcomes vary materially by plant, stack, scope, and data quality. Not a guarantee of future results.
Configured on your data within days.
Send us a workflow you describe and a piece of real data: a drawing, a BOM, an RFQ packet, an inventory export. We configure Polymr on your data, demo the working result within days, and ship the first module faster than any traditional ERP partner-led rollout.
From there we expand into adjacent workflows only after the previous module hits its agreed success metric. References under NDA on request.